Skip to main content
Loading…
This section is included in your selections.

If the construction permit specifies the location of facilities by depth, line, grade, proximity to other facilities or other standard, the permittee shall cause the location of such facilities to be verified by a state-registered land surveyor. The permittee may be required to relocate any facilities which are not located in compliance with permit requirements at permittee’s expense. (Ord. 6797 § 1 (Exh. A), 2020; Ord. 5042 § 1 (Exh. C), 1998.)