Skip to main content
Loading…
This section is included in your selections.

Water service charges shall start from the day the premises are connected with the city’s water service meter. The water will be turned on at the time the water meter is installed. At the time water is turned on, service charges for sanitary sewer and storm drainage shall also begin as applicable. (Ord. 5849 § 1, 2004; Ord. 5216 § 1, 1999; Ord. 4878 § 3, 1996.)