Skip to main content
Loading…
This section is included in your selections.

A. Where base flood elevation data have been obtained pursuant to ACC 15.68.130 and 15.68.150, the floodplain administrator or designee shall obtain, record, and maintain the actual “finished construction” elevations provided by the applicant for the locations listed in ACC 15.68.170. This information shall be recorded on a current FEMA elevation certificate signed and sealed by a professional land surveyor, currently licensed in the state of Washington.

B. For all new or substantially improved dry floodproofed nonresidential structures, where base flood elevation data has been obtained pursuant to ACC 15.68.130 and 15.68.150, the floodplain administrator or designee shall obtain, record and maintain the elevation (in relation to the datum of the effective FIRM) to which the structure was floodproofed. This information shall be recorded on a current FEMA floodproofing certificate by a professional engineer currently licensed in the state of Washington.

C. Certification required by ACC 15.68.410 (Floodway standards).

D. Records of all variance actions, including justification for their issuance.

E. Improvement and damage calculations.

F. Maintain for public inspection all records pertaining to the provisions of this chapter. (Ord. 6761 § 1 (Exh. A), 2020.)