Skip to main content
Loading…
This section is included in your selections.

A. All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system;

B. New water wells shall be located outside the floodway and shall be protected to the FPE;

C. New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into the floodwaters;

D. On-site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding. A habitat impact assessment shall be conducted in accordance with ACC 15.68.440 as a condition of approval of an on-site waste disposal system to be located in the Special Flood Hazard Area. (Ord. 6761 § 1 (Exh. A), 2020.)