Skip to main content
Loading…
This section is included in your selections.

A. Consistent with ACC Titles 12 and 13 and the city’s engineering design and construction standards, all utility lines serving the subdivision, including but not limited to power, telephone and television cables, shall be installed underground. Adequate easements shall be provided for all such utility lines which will not be located within public way. Television conduit and miscellaneous hardware shall be installed according to the requirements of Chapter 20.06 ACC.

B. Whenever an intersection of an arterial and any other street is constructed or improved under the requirements of this title, and when the city engineer has determined that traffic signalization of such intersection will be needed in the future, the city engineer may require the installation, at the applicant’s expense, of underground conduit which will be necessary for and will facilitate such future signalization. (Ord. 6799 § 1 (Exh. A), 2020; Ord. 6239 § 1, 2009; Ord. 5164 § 1, 1998; Ord. 4296 § 2, 1988. Formerly 17.12.240.)