18.47.020 Permitted locations.
This section is included in your selections.
EVI Type |
Zoning District |
||||||
---|---|---|---|---|---|---|---|
PUD, RC, R-1, R-5 |
R-7, R-10, R-16, R-20 |
C-N, RO |
DUC |
C-1, C-2, C-3 |
M-1, M-2 |
I, P-1 |
|
P3 |
P3 |
P |
P |
P |
P |
P |
|
P5 |
P5 |
P |
P |
P |
P |
P |
|
X |
X |
X |
X |
P |
P |
P |
Development Standards:
1Level 1 and Level 2 charging only.
2Level 1 and Level 2 charging are permitted in aquifer recharge areas and in other critical areas when serving an existing use.
3Allowed only as accessory to a principal outright permitted use or permitted conditional use.
4The term “rapid” is used interchangeably with Level 3 and fast charging.
5Only “electric vehicle charging stations – restricted” as defined in ACC 18.04.354.
(Ord. 6885 § 1 (Exh. A), 2022; Ord. 6365 § 2, 2011.)