Skip to main content
Loading…
This section is included in your selections.

A. Project proponents interested in applying for flexible development under this chapter must follow the requirements of the underlying permit process as outlined in ACC Title 14 with the following exceptions:

1. Prior to submittal of an application that incorporates proposed flexible development standards, the applicant must first submit:

a. A checklist on a form provided by the city of Auburn outlining the features that the development proposal will utilize to reach the required minimum 100-point eligibility needed to utilize flexible development standards.

b. A conceptual site plan (including conceptual design of all public utility facilities and road design) and narrative that identifies the features that meet the 100-point requirement of ACC 18.49.020, 18.49.030, or 18.49.040 based on development type, and that identifies the flexible development features of ACC 18.49.050, 18.49.060, and 18.49.070 based on development type that the applicant proposes to utilize for the development proposal.

B. The city of Auburn shall evaluate flexible development submittals provided pursuant to subsection A of this section and provide a written statement identifying whether or not the applicant met the required minimum score and is allowed to utilize flexible development standards outlined in this chapter.

C. A flexible development proposal must demonstrate its compliance with the city of Auburn design and construction standards and any modifications to those standards that the city engineer allows through application of this chapter.

D. Modifications. Any proposed modifications to development projects that have been accepted as flexible development proposals, and that include amendment to a flexible development eligibility feature or flexible development standard called out in the application materials submitted as part of the requirements of subsection A of this section, must be reevaluated through revised application submittals that provide information consistent with the requirements of subsections (A)(1)(a) through (b) of this section.

E. Eligibility Criteria Review and Amendment. The city shall conduct a review of eligibility criteria contained in this chapter one year after adoption of the implementing ordinance. After the initial review, the city may elect to review and modify eligibility criteria contained within this chapter as part of the city’s annual docket process through a legislative nonproject decision pursuant to ACC 14.03.060. (Ord. 6245 § 19, 2009.)