Skip to main content
Loading…
This section is included in your selections.

Approval of a small wireless facility permit and/or other approval referenced in this chapter are conditioned on the following requirements:

A. Satisfy applicable requirements, such as noise and light regulations.

B. Comply with adopted design and concealment standards as provided by the city’s engineering design and construction standards.

C. Obtain the written approval of the owner of any pole or structure for the installation of its facilities on such pole or structure. Approval of a franchise under Chapter 20.04 ACC does not authorize attachment to city-owned poles or other structures.

D. Unless specifically provided for in a franchise, obtain a lease or other applicable authorization from the city to use city-owned poles, ground space or infrastructure for the installation of any small wireless facility, or to locate any new ground-based structure, base station, or other attendant equipment on city-owned facilities or property.

E. Comply with all city construction standards and state and federal codes when operating in the public way and obtain a required permit to enter the public way for construction.

F. If the applicant does not take action in good faith, the application will be considered abandoned after 180 days of nonaction. (Ord. 6798 § 3 (Exh. C), 2020; Ord. 6707 § 1 (Exh. A), 2018.)